Skip to main content

Creating a new Testplan

When you have created your test objects, you can start creating testplans.
A testplan is a collection of rules and limits that are used when choosing the tests to perform, and limits to apply.

Test plans are part of the test object, so you can have different test plans for the same box or cable. This is useful when you have different types of tests, for example a quick test and a full test.

Adding testsplans​

To add a testplan, click on the "Related Test Plans" tab when you have a test object selected.
Then click on the "Create" button to create a new test plan.

create testplan

Enter a name and description for the testplan, then click on "Create".
The name is used to identify the testplan, so it must be unique for this test object.

The description is optional, but it can be useful to provide additional information about the testplan, such as its purpose or the tests it includes.

You can also choose how long the test result is valid. And choose if and how many labels you want to print on pass or fail.

Then you can click on the generate default testplan button to generate a default testplan based on the components of the test object.

tip

Enter a whitespace in the description to show the generate default testplan button if you do not want to provide a description.

Testplan properties

Default included tests​

By default, a testplan will include:

  • Visual Test (mandatory)
  • Connection test (mandatory)
  • Resistance test (mandatory)
  • Insulation test (required if RCD or Functional test is included)

For test object of type Distribution Box, the testplan will also include:

  • RCD test time/value (optional, only if RCDs are included)
  • Functional test (optional, recommended if RCDs are included)
  • Finalizing Connection test (optional)

default testplan box

Customizing the test plan​

When the default testplan is generated, you can customize it by enabling or disabling tests.
Scrolling down you can adjust the options for each enabled test, such as the limits or the test method.

You must click Next for each test to ensure all configurations are considered.

default testplan box

Tests​

The EST is capable of performing a variety of tests on the test object. Below you will find each test described in detail, with their respective options.

Detailed specifications for measurements can be found in the Technical Specifications.

Visual Test​

The visual test is a mandatory test that asks the operator to inspect the test object for any visible defects or issues. You can add custom instructions, for example a checklist to guide the operator during the visual inspection.

If the operator fails the visual test, they must add a comment to provide more information about the failure.

This test must pass for other tests to continue.

visual test

note

Ensure the correct instructions are provided for the visual test, as required by NEN 3140+A3:2019 (5.102.10).

Connection Test​

The connection test is a mandatory test that checks if all components are properly connected to the EST.
This test is a low voltage connectivity check to ensure that all connections are as they are defined in the Test Object definition.

This test must pass for other tests to continue.

This test currently has no options but Strategy Auto.

Resistance Test​

The resistance test measures the resistance of all conductors in the test object. This test is optional. Although it is recommended to include this test in the testplan.
This test must pass for other tests to continue, but a shallow fail during this test does not prevent the operator from continuing with the other tests, however the test result will be marked as failed.

OptionDescription
Temperature CompensationWhen enabled, the resistance measurements are temperature compensated to 20°C.
Additional LimitAdditional resistance limit (Ohms), to compensate connecting cable and circuit breaker contacts
Maximum LimitMaximum resistance limit (Ohms), to ensure the conductors are within acceptable range
Test Maximum SpreadMaximum allowable difference between the highest and lowest resistance measurements (%)

The final limit is determined by summing the additional limit and the maximum limit summed.

The spread option can be used to detect and fail on large variations between the conductors, which can be an indication of a problem with the test object, such as a loose connection or a damaged conductor. It is recommended to enable this for cables longer than 5 meters, as the error introduced from contact resistance is more significant for short cables and can cause false failures.

testplan resistance

note

Resistance test may not be fully compliant with NEN 3140+A3:2019 (5.101.5.3b) requirement of at least 0.2A test current.
Enable Protective Conductor Test for full compliance.

Protective Conductor Test​

This variant of the resistance test measures the resistance of only PE conductors in the test object. This test is optional. Although it is recommended to comply with NEN 3140+A3:2019 (5.101.5.3b) for protective conductor resistance. This test must pass for other tests to continue.

You can use similar limit values as the general resistance test.

This test is slower and provides results with less resolution compared to the Resistance Test.

OptionDescription
Temperature CompensationWhen enabled, the resistance measurements are temperature compensated to 20°C.
Additional LimitAdditional resistance limit (Ohms), to compensate connecting cable and circuit breaker contacts
Maximum LimitMaximum resistance limit (Ohms), to ensure the conductors are within acceptable range

The final limit is determined by summing the additional limit and the maximum limit summed.

testplan resistance

note

Protective conductor test is available from software version 0.10.

Insulation Test​

The insulation test measures the insulation resistance between the conductors in the test object. This test is optional, but it is required if RCDs or functional tests are included in the testplan, as a failed insulation inhibits applying voltage for the RCD and functional test. This test must pass for RCD and Functional tests to continue.

testplan insulation

OptionDescription
Test VoltageThe test voltage to be applied.
Only Test to EarthThe test will only measure each conductor to earth (PhasePE)
This is required if the test object contains consumers that may be damaged or cause false failures
Test Frame InsulationIf enabled and a socket of type Chassis Clamp Point is present in the Test Object
A test of the insulation between the frame and all conductors will be performed.
Exclude Not Connection PinsIf enabled, pins with connection class NC will be excluded from measurement.
Shortening overall test duration for certain multipole test objects.
Minimum Limit (Ω)Minimum insulation resistance limit (Ohms)
note

If Type B RCD's are included, the default testplan will enable Only Test to Earth and not perform a insulation test between phases as the active electronics in the RCD will cause a false failure. Or potentially damage the RCD.

note

When a distribution box has panel meters or phase indicators, the insulation test may fail. Either turn on the Only Test to Earth option, or temporarily disconnect the panel meter from the box and add it as a separate test object to be tested without insulation test.

RCD Test​

The RCD test is a optional test that checks if the residual current device (RCD) in the test object operates correctly.

There are no options for this test

The RCD test uses a 1.0 xIΔN for the RCD time test and follows the IEC standards to determine pass/fail for the test used, see below.

RCDTestmethodStandardLimit
Type ARectifiedIEC61008:2013 Table 201.4 xIΔN
Type BSmooth DCIEC62423:2013 8.2.1.62.0 xIΔN
note

This means that for Type A and Type B RCDs a valid trip current may be higher than 30mA.

tip

NEN 3140+A3:2019 (5.101.5.9 and 5.102.18) only require a RCD time test for at nominal rated residual current.
This means the slower RCD-value test is not required by the standard, and can be skipped to save time.

info

When testing Selective RCD [S] a delay of 30 seconds is inserted as the instruments pre-test checks may influence the delay mechanism.

warning

Type AC RCD are generally not permitted (NEN 1010:2015) as they are insensitive or are even blinded by rectified AC or smooth DC residual currents.
If used, they are tested with sinusoidal test current and x1.0 IΔN.
We recommend to replace these RCDs with Type A or Type B RCDs.

note

RCM (Residual Current Monitoring) devices, or configurable RCD protection devices, are generally not allowed by regulation in installations as protective devices. The EST does not excplicitly support testing of RCM devices. However, if configured as if they operate like Type A or B RCD the EST can will test them.

Functional Test​

The functional test is a optional test that checks if the test object operates correctly under normal conditions. You can add custom instructions, for example a checklist to guide the operator during the functional test.

If the operator fails the functional test, they must add a comment to provide more information about the failure.

functional test

info

NEN 3140+A3:2019 (5.101.5.9) requires the test button on an RCD to be tested, after the measurement of the RCD itself.
The functional test is the place to perform this check. The operator must perform and evaluate.

Finalizing Connection Test​

The finalizing connection test is an optional test that checks if all conducters are connected. This test does not check for rotations or miswiring. With this test a test object ends the test process will all switches, breakers and RCDs turned on.

A failed finalizing connection test will fail the entire test.

There are no options for this test